Plumbing service call checklist: shut off, fix, test for leaks and clean up
Find and test the main shut-off, protect the floor, shut water off at the fixture, do the work, turn water on slowly and check every joint, and clean up. Tell the customer if the work needs a permit. Send this list back to the owner.
Arrive4
The work6
Water heaters4
Test4
Finish4
From checklisted.page/checklist/plumbing-service-call-checklist
Common questions
Why find the main water shut-off first?
If a pipe or valve breaks during the work, you need to stop the water fast. Showing the customer where it is helps them in an emergency too.
Does plumbing work need a permit?
Many towns require permits for water heaters, new lines and bigger repairs. Check with your town's building department.
How do you check a new plumbing joint for leaks?
Turn water on slowly, wipe the joint dry, then hold a dry paper towel under it. Check again before you leave, since slow drips take time.
Learn more
Plain-English guides from our sister sites:
- A pipe burst or the basement flooded explained.page
This list helps you remember things. It is not legal, medical, tax or financial advice. Rules differ by state, so check with the office or professional in charge. Disclaimer.